Housekeep

18ºC,sunny.
Jobs done: it’s ironic that on a weekend at home, feeling ill, that I got more done than ever. Normally on a fine Autumn Sunday, I’d spend the day on the bike enjoying the landscape and sun.
image
Now, door-frame and gate post painted; patio cleared; curtains washed; garden cleared for winter and shopping done. An interesting job is coming up- part of a door frame is rotten, so I will cut out the bad bits and make new.
This headcold is past its worst, so I could be riding again later this week. A good result.

Posted on my phone.

Argo

16ºC,clear.
Film: Argo, tense, but not that tense, likable characters, but not that likable. A film worth seeing but don’t go out of your way, there are other films available.
Despite rather an ill weekend, I have done stuff- the garden table is finished, with dry varnish this morning. On this weekend, with no travelling, my todo list is much shorter. The daytime routine is job then nap, then another job…

image

I spent money yesterday, some went on a cordless drill. The old one one is shagged out, though was never great to start with. Now I want to find something to fill with holes. If there are enough holes, might the thing cease to exist?

Posted on my phone.

Make table.

22C, sunny.
Today, I made a table. It’s made from a fork-lift pallet and a bed-headboard. So far it has cost nothing. All the wood and fixings I had hoarded already. There is four hours’ work in it so it so far. I had to stop at 7pm because, once hungry, I started making mistakes.
Now, it stands outside unvarnished and unprotected, but the forecast is good for tomorrow.

image

The idea is to use it for gardening tasks. It needs to be substantial and weather resistant. To finalise it, I need to add bracing to make it more rigid.
I will have to search out something to brace corners, there should be something in the shed I can use.

Posted by mobile phone.

Day one.

19°C, mostly cloudy, windy.
First job of the holiday is done. I used a palette out of the skip at work to make a new garden table.
Before:

image

After-

image

After about 3 hours of wood working

The wood preservative is drying now so I can’t use the table until tomorrow.
How satisfying, I keep going out to look it over. Almost inevitably, I mind turns to other similar projects- I have another garden table that is slowly collapsing with rot.

Week off.

14C, lighter wind.
I need a holiday. With a week off, this empty feeling should recede. A week is not enough to get everything done- domestic re-arrangements, hiking, visiting, (not least) marking.
Anyway, I have been to a wedding. Of society’s demands, this is my least favourite. No, I hate weddings, please don’t make me go to another.

How do I fix this?

5°C, heavy non-stop rain.

Repair: my phone line is often very poor, the crackle & hiss is so loud that I can’t hear what people are saying and it often cuts off my ADSL internet connection. Okay, but it costs £99 to get a British Telecom engineer out and they may decide that it’s an internal fault and not do any repair.

So, now on a very wet Sunday afternoon, I could replace the internet wiring run from the BT box. It’s an intermittent fault, and what do you know- it’s clear right now.